Installation

Why do stainless steel threads become jammed on element terminals?

We use stainless steel element terminal bolts.

Can your Vent-Sure discharge out of the roof instead of the wall?

There is no problem whatsoever venting the kiln out of the roof as long
as you take precautions to protect the opening like you would any roof
vent.

How to Unpack and Assemble an L&L DaVinci Top-Loading Kiln (Video)

Category: 
Assembly
Thumbnail: 
Video: 
Teaser Text: 
An instructional video for assembling an L&L DaVinci Top-Loading Kiln
Relationships

An instructional video for assembling an L&L Top-Loading DaVinci kiln

Instrucciones de instalación para los hornos Easy-Fire & School-Master de L&L

Teaser Text: 
Installation Instructions for L&L Easy-Fire & School-Master Kilns (Spanish)
Include with Instructions PDF: 
Instructions
International: 
International
Category: 
Installation
File Size: 
0.00 KB
Relationships

Notes on Sectional Kiln Construction

Kilns used on

  • All L&L top-loading kilns are sectional.Front-Loading kilns are not sectional.

Why do we use sectional construction?

There are some small ceramic discs wedged in some of the element holders. Do I fire that way first to keep the elements in place?

The discs are placed in the element holders to keep the elements from coming out during shipment.

It is not necessary to keep them in place for the first firing.

Installation Instructions for L&L Easy-Fire and School-Master Kilns

Teaser Text: 
Installation instructions for both the Easy-Fire and School-Master kiln lines. Revision:4-15-12
Include with Instructions PDF: 
Instructions
International: 
USA
Category: 
Installation
File Size: 
162.36 KB
Relationships
Syndicate content