Electrical

Replacing Control

  1. Unplug kiln.
  2. Remove the four #6 screws that hold the control in place from the front face of the control panel.
  3. Main Image: 

Removing Panel for Service

  1. Unplug the kiln.
  2. Main Image: 

Check transformer for proper operation

  1. Check voltage across the top center tap and either of the two top taps.
  2. Main Image: 

Check internal wires

    Main Image: 
    Extra Images: 

Check power cord

  1. Make sure power cord is plugged in.
  2. Reseat the plug. Pull it out of the receptacle and put it back it. This will reseat the connections.
  3. Main Image: 

Check operation of the On/Off Toggle Switch

  1. Make sure the On/Off switch is turned on.
  2. Main Image: 

What is a UL499 or MET listing?

Is UL499 Listing Required?

How do I hook up my kiln to power?

L&L's official recommendation is for an electrician to connect the kiln to power.

Syndicate content